GM And LG Restart EV Battery Production In Ohio After Seven-Month Shutdown
GM and LG have resumed battery cell production at their Ohio plant after a seven-month pause. The Warren facility, which halted output in early 2026 amid weaker EV demand, is now back online. No specific pricing was disclosed.
Written by the Beseyat editorial team. For full details, see the original report at InsideEVs.
Original reporting: InsideEVs ↗
Comments (0)
No comments yet. Be the first to comment.